D-311















Facilities and Features

• The project consists of two stages: the first is the shops that will be completed at the end of February 2019, where the project area starts from 75 square meters to 270 different systems, and some of them are equipped with a terrace or without a terrace. The second phase is related to residential units.
• The construction area is 15.000 m2.

Restaurants & Cafe
Green Spaces
24/7 Security guard
Surveillance Cameras
Earthquake Resistant Building
Indoor car Park

Location and Strategic Importance

Apartment Plans

DMCA.com Protection Status